Global Atomic Announces Uranium Mineralization Continues to Grow Along Strike and Down Dip at DASA Project

August 15, 2018

Step Out Drilling Returns 3,353 ppm eU3O8 over 69.8m Including
38,653 ppm (3.9%) over 4.6M eU3O8 at Tegama Hill Main Zone

Toronto, ON: Global Atomic Corporation (“Global Atomic” or the “Company”), (TSX-V: GLO / OTCBB: SYIFF / Frankfurt: G12) is pleased to announce the following exploration update from its flagship DASA Project in the Republic of Niger, West Africa.

Highlights:

  • Drilling at DASA along strike and down dip has been successful in confirming Global Atomic’s geologic interpretation of the deposit and has identified five distinct areas of new mineralization.
  • High grade mineralization was intersected at the Tegama Hill Main Zone, hole ASDH 577 returned 3,353 ppm eU3O8 over 69.8 metres, including 38,653 (3.9%) eU3O8 over 4.6 metres.
  • Southwest Extension Zone 1 proved to have excellent mineralization in the Teloua formation, with hole ASDH 558 returning 19,933 (2.0%) eU3O8 over 9.5 metres, which included 54,101 (5.4%) eU3O8 over 3.3 metres.  ASDH 574 returned 1,737 ppm U3O8 over 85.9 metres, including 5,597 ppm eU3O8 over 3.6 metres.

 View PDF